1. The mock-up on March 29th(10 courses high)
2. Jon, the window, and the mock-up(7 courses high)
3. The electrical wiring strip anchor that enables wires to come in and out of the structure
4. An earthbag being taken out of its mold and being placed on the mock up
No comments:
Post a Comment